Deposit
Before work starts
We have no verified deposit limit for South Carolina. Ask what the deposit pays for, and pay in stages tied to finished work.
Ask: What does the deposit pay for, and can the rest be paid in stages as work is done?
Your rights
South Carolina
South Carolina · home improvement
Before work starts
We have no verified deposit limit for South Carolina. Ask what the deposit pays for, and pay in stages tied to finished work.
Ask: What does the deposit pay for, and can the rest be paid in stages as work is done?
If sold at your home on credit, a card or a loan
Cancel in writing by midnight of the third business day. Cash or check sales at home get the federal 3-day rule.
Some sales are excepted, such as emergency work you ask for in a signed waiver.
When it applies
A seller personally solicited the sale, you agreed to it at your home, and you are paying on credit from the seller, by credit card, or with a consumer loan tied to the sale. If you pay cash or by check, South Carolina's rule does not apply, but the federal FTC Cooling-Off Rule gives a similar 3-business-day right for door-to-door sales of $25 or more made at your home.
If a seller came to your home, you signed there, and you are paying on credit, by credit card or with a loan tied to the sale, you can cancel in writing until midnight of the third business day after you sign. The seller must return your payments within 10 days of getting your notice. Cash or check sales of $25 or more made at your home get a similar 3-business-day right under the federal FTC rule.
Check it before you sign
Residential Builders Commission
Your contractor
Jobs over $5,000 need a residential builder license. Specialty jobs over $500 need a state license or registration.
South Carolina requires a residential builder license from the Residential Builders Commission for home building, repair or improvement jobs over $5,000. Specialty jobs over $500 need a state license (plumbing, electrical, HVAC) or a state registration (roofing, siding, carpentry, painting and other listed trades). Look the contractor up on the LLR licensee lookup before you sign.
Who needs one: Residential builders: anyone who builds, repairs or improves a residential building (up to three floors, and no more than 16 units in an apartment building) when the job costs more than $5,000 must hold a residential builder license. Specialty contractors hired by a residential builder, a general contractor or a property owner for specialty work over $500 must also be credentialed: plumbers, electricians and heating and air conditioning installers are licensed by exam; siding, insulation, roofing, floor covering, masonry, drywall, carpentry, stucco, painting and wallpapering, and solar panel installers are registered.
Who doesn't
Issued by: South Carolina Residential Builders Commission (Department of Labor, Licensing and Regulation)
No statute we read lists terms every contract needs. These apply only in the cases named.
An estimate isn't the contract. Ask for all 4 in writing before you sign.
In the rule's words
If a seller came to your home and you signed there while paying on credit, by credit card or with a loan tied to the sale, you must sign a written agreement dated the day you actually sign it. It must carry a 'BUYER'S RIGHT TO CANCEL' notice (or the federal FTC cancellation notice), and you must get a copy at signing that shows the date and the seller's name and mailing address.
In the rule's words
For any door-to-door sale of $25 or more made at your home, including cash deals, federal law requires a completed copy of the contract in the same language as the sales pitch. It must show the date and the seller's name and address, put a bold cancellation statement next to your signature, and include two copies of a cancellation form.
In the rule's words
If an insurance claim will pay for roof work, the contractor must give you a bold notice that you may cancel within five business days after your insurer tells you in writing that the claim is not covered. A detachable NOTICE OF CANCELLATION form, in two copies, must be attached to the contract.
In the rule's words
If the contractor holds a Contractor's Licensing Board license (general or mechanical contractor), it must contract in the exact name on that license. Mechanical contractors licensed for air conditioning, heating or packaged equipment must print their license number on every proposal and invoice.
Notes from our check
General information from official South Carolina sources. For your situation, ask the state's consumer protection office or a lawyer.